Quote:
Originally Posted by livecoug
they are building a BYU SL campus there along with a LDS business college campus.. probably in it's own tower. So, there will be a renovated mall, the two colleges and 900 units of housing.
|
I believe that the BYU SL center and LDSBC will be done with summer, because they are moving July 13.